Project size: 1500 sqm.
This project required enhancing the appeal, durability, and safety of the bluestone flooring in the Rialto. Both the internal foyer floor and the external piazza bluesto...
TIC Group Marketing
Project size: 4,000 sqm.
For this project, we needed to repair and seal the concrete floor for the marketing department of TIC Group. The traditional approach, before the floor could be worked ...
Paramount Road
Project size: 10,000 sqm.
The concrete floor in this facility had served its purpose well for many decades, but it was in poor condition from the daily heavy wear and damage. This left the owne...
Myer Centerpoint, Albury
Project size: Approximately 2,500 sqm of Tarrazzo.
The floor of Myer Centerpoint in Albury had been stripped and sealed many years ago, but was due for another treatment. The client this time w...
Casey Central, Melbourne
Project size: 2,000 sqm.
Casey Central is a regional shopping centre located in Narre Warren South, Victoria. It has over 90 shops, three supermarkets and Kmart. It also has a fresh food hall a...
Madame Brussels Lane Melbourne
Project size: 1,500 sqm of Bluestone.
Madame Brussels Lane is a return lane off Lonsdale Street between Exhibition and Spring streets in Melbourne. This lane was named after Madame Brussels, a ...
King Street Cladding
Project size: 180 lineal meters of cladding.
This heritage listed Victorian cladding is over 100 years old, stretching from Rialto on Collins Street to Flinders Lane, Melbourne.
Diverse Floo...
570 Bourke Street Melbourne
Project 300 sqm.
The bluestone pavement of this building had failed to meet the minimum slip safety rating. So the client was understandably concerned about the increased possibility of acciden...
TIC Group Salvage
Project size: 35,000 sqm.
The 35,000 sqm warehouse was constructed in the 1950’s for Olex Cables to manufacture cables. It was acquired by TIC Group in 2016 and re-purposed as a distribution ...
The Strand ISPT
Project size: 700 sqm.
The floors at this modern retail property had previously been sealed, but the client had concerns about them and was looking for a longer-term finish. They also required ...
Westfield Doncaster
Project size: 19,000.
The tiled flooring at this popular shopping centre was struggling to hold up under the considerable wear, especially in the areas of high foot traffic. The centre consulte...